Running Netlogo on Windows Server 2016

classic Classic list List threaded Threaded
2 messages Options
Reply | Threaded
Open this post in threaded view
|

Running Netlogo on Windows Server 2016

NetLogo-Users mailing list
Dear Netlogo users,
 
 Does anyone of you have experiences with running Netlogo on Windows Server 2016? Respectively has anyone experienced bugs or problems with it?
 
 Thanks for your replies,
 

 Claudine

Reply | Threaded
Open this post in threaded view
|

Re: Running Netlogo on Windows Server 2016

NetLogo-Users mailing list
Hello sorry for posting it here but I am unable to paste it as a new topic. I want to convert the pseudo code below to Netlogo, can any one please help? Thank you

 Create 53 employees (50 specialists, 2 managers, and 1 director)
Ask each employee {
Set the 30-tuple, with each dimension takes a value of -1, 0, or 1 with equal probabilities
Set learning rate p1 = the learning rate treatment of the current simulation session
If I am a manager
[Set learning rate = 1.25 × p1]
If I am a director
[Set learning rate = 1.5 × p1]
If the current workplace rigidity treatment = “rigidity”
[form a tie with a randomly chosen superior]
Else
[form a tie with another randomly chosen employee]
}
Create the ITSS
Ask the ITSS {
Set the 30-tuple, with each dimension takes a value of 0
Set the flexibility p2 = the ITSS flexibility treatment of the current simulation session
}
Create the work requirements
Ask the work requirements {
Set the 30-tuple, with each dimension takes a value of -1, 0, or 1 with equal probabilities
}
Run one tick of the model clock {
Ask the ITSS [adapts to the majority practices of employees]
Ask each employee [learn from the ITSS and learn from each other (the order of these two actions is randomly
determined)]
}
Repeat the “Run one tick of the model clock” procedure 12 times
Set assimilation of the ITSS = average (the proportion of identical values between the 30-tuples of the ITSS and the
employees)
Set IT-based work performance = average (the proportion of identical values between the 30-tuples of the work
requirements and the employees)